Concrete results from floors and warehouses
We don't sell textbook theories. We show hard data on how our audits and Lean Manufacturing implementations translated into real profit in Polish companies.
Shortening loading time by 38% at the plant in Tczew
The steel structure producer was losing 4,800 PLN a day due to truck queues. We changed the notification system and maneuvering square layout in 19 business days.
Recovery of financial liquidity of a transport company in 114 days
A Gdynia-based company had 314 overdue invoices and no fuel in the tanks. We rebuilt the cost structure and recovered 1.4 million PLN of frozen capital.
Reduction of production defects by 12.4% in an electronics factory
We introduced a visual control system on 3 assembly lines in Słupsk. The number of rejects fell from 17 to 4 units for every batch of 1,000.
Start recovering money
Choose the form of cooperation that best fits the current situation in your plant.
Express Audit
A one-day visit to the shop floor. We find 5 main wastes and calculate the potential for savings.
- Analysis of 3 key processes
- Report with a waste list (Waste Map)
- Calculation of return on investment
Lean Implementation
Full care over the change process. We enter the company for 3-6 months and monitor the results.
- Foreman training on the shop floor
- Implementation of 5S, SMED, and Kanban
- Guarantee of reduction in defects by at least 10%